Services
Home Profile Careers Services Resources Site Map

Storm Water Projects

Detroit River Greenways Master Plan   U.S. Army Corps of Engineers Detroit River Greenways Master Plan
Wade Trim served as Manager for a pre-planning study along the Detroit River between the Ambassador Bridge and the Belle Isle Bridge. The study identified potential greenway system projects that will assist in meeting the vision of the study partners. Study results indicated that there is Federal interest in entering into the next phase of a water resources project that could be a feasibility level study, or possibly another Corps of Engineer authority.
Detroit River and Belle Isle Restoration Study   U.S. Army Corps of Engineers Detroit River and Belle Isle Restoration Study
Wade Trim undertook a study of shoreline/seawall structural stability along the Detroit River and assessment of potential riverfront habitat restoration. Potential ecosystem restoration projects were identified that will assist in meeting the visions of the study partners, City of Detroit and American Heritage Rivers Initiative. Conceptual designs were developed to incorporate bio-engineered shoreline protection techniques. A video summarizing the project purpose and findings was also developed in DVD, VHS and Web versions.

1 | 2

^Top