John Weiland, PE, joined our Water Resources Group as a Senior Project Manager where he is leading our expansion into St. Louis, MO, and work with the Metropolitan St. Louis Sewer District (MSD). With 17 years of experience in wastewater, stormwater and construction management projects, John’s career includes extensive work with MSD ranging from pump station and force main projects to Combined Sewer Overflow (CSO) and Sanitary Sewer Overflow (SSO) relief studies.

Wade Trim is performing preliminary study and design services for sanitary sewer storage facilities in the Lemay Service Area for MSD. Our services comprise storage sizing and hydraulic evaluation, as well as preliminary civil, structural, process mechanical, electrical, instrumentation, and operational design considerations.

Our office is located in the downtown area:

Wade Trim
500 N. Broadway
Suite 1340
St. Louis, MO 63102
314.669.0038